With the delivery of the heat pump to the Siebleben heating plant, the implementation of Gothaer Stadtwerke ENERGIE's current innovate CHP project is making great strides. The expansion of the site has been ongoing since 2024. In addition to the heat pump, a power-to-heat system is also being built.
With the new power system, the municipal utilities can reduce CO2 emissions from heat generation by approximately 230 tons per year.
picture: https://www.stadtwerke-gotha.de/